Shed pad, garage floor or addition: three different slabs
If you're calling about a concrete slab in Brooksville, it's likely one of three jobs. A pad for a prebuilt shed or a small shop. A garage floor, attached or detached. Or a slab foundation that will carry walls, a roof and maybe a heated room. All three are concrete slabs. They aren't the same pour. The shed slab can be a simple 4 inch reinforced square. The garage floor takes car weight at the door and needs a clean joint where it meets the driveway apron. An addition slab gets footings, termite treatment, a vapor retarder and inspections.
Our first question is what goes on top. The second: will it ever be enclosed and cooled? A bigger metal building or a barn you might live in later belongs on our barndominium and metal building foundation page. A flat concrete pad for a camper or boat trailer is closer to a driveway, and our RV, boat and carport pad page covers it.
Who signs off on a concrete slab in Brooksville: City Hall or Providence Boulevard
Brooksville is split between two building departments. Look your parcel up on the Hernando County Property Appraiser site: Levy Code CWBE means the City of Brooksville Building Division at City Hall on Howell Avenue, and CWES means the Hernando County Building Division on Providence Boulevard. The city quotes about 10 working days for a first residential plan review, and starting before the permit is issued costs a penalty equal to the full permit fee on top of the fee itself.
Out in the county, the 2026 fee schedule lists a flat $180 for a slab, $300 for a garage and $140 for a storage building of 200 sq ft or less, plus state surcharges. The county's exemption list is where shed owners save money. A shed of 120 sq ft or less is exempt. Sheds from 120 up to 288 sq ft and premanufactured carports must be DBPR approved and anchored, and the list puts it plainly: existing slab, no permit; new slab with footings, permit required.
Patio style slabs under 500 sq ft are also exempt, but the same list says any slab poured with the intent of future vertical construction needs a permit, and none of the local exemptions apply inside a Special Flood Hazard Area. Our permit guide for Hernando, Citrus and Sumter walks through the Notice of Commencement and the $7,500 rule.
Our slab ranges, by size. Square footage, edge thickening, steel, base work and how close the truck can get move your number inside the range.
| Job | Per sq ft | Typical project | What moves the price |
|---|---|---|---|
| 4 in. reinforced slab, shed to 2-car garage (about 200 to 600 sq ft) | $7 to $12 | $1,400 to $7,200 | Size, thickened edges, base work, truck reach |
| 12 by 16 shed pad (192 sq ft) | $7 to $12 | $1,344 to $2,304 | Anchor layout for the shed, access to the backyard |
| 20 by 20 detached garage or shop (400 sq ft) | $7 to $12 | $2,800 to $4,800 | Thickened wall edges, mesh or rebar, apron joint |
| 24 by 24 two-car garage floor (576 sq ft) | $7 to $12 | $4,032 to $6,912 | Edge depth, poly if it may be cooled later |
| Addition or monolithic slab with footings | Quoted from the plans | Free written estimate | Footing size, termite treatment, inspections |
Ranges only, with a free written estimate after we see the site. Permit fees are separate: Hernando County lists $180 for a slab permit, and the City of Brooksville sets its own fees.